Mayjan Engineering was tasked with the mechanical installation of a state-of-the-art pallet system for Primary Connect, focusing on seamless integration and optimal efficiency. Our expert team handled the installation of key components, including conveyors, pallet lifts, and automated access systems, ensuring smooth operations and minimal disruption to site activities.

Mayjan Engineering supported the mechanical installation works for the Amazon BWU2 distribution facility, contributing to the delivery of high-capacity conveyor and sorting infrastructure. Our team installed key mechanical components, completed structural adjustments, and ensured accurate fit-up across the system to support reliable, high-volume operations. By coordinating labour, resources, and on-site activities, we helped streamline the installation process and ensured the new equipment was integrated efficiently and ready for commissioning within project requirements.

Mayjan Engineering was engaged to deliver a comprehensive mechanical upgrade for Visy Beverage Cans, supporting increased production capability and improved line performance. Our team managed the installation of new machinery and conveyor systems, as well as the removal and decommissioning of outdated equipment. We completed structural modifications to suit the upgraded layout, ensured precise mechanical fit-up, and assisted closely with commissioning to bring the new system online smoothly. Throughout the project, Mayjan Engineering coordinated labour, resources, and site activities to maintain efficiency, minimise downtime, and deliver a reliable, production-ready outcome.

Mayjan Engineering was engaged to relocate major production equipment for Visy RPET Plastics, transferring multiple heavy machines from their Kings Park facility to the Ingleburn site. Our scope included the full mechanical removal, transport, and reinstallation of process machinery, along with associated pipework, conveyors, supports, and integrated components. The team executed precise disconnection, tagging, lifting, and alignment processes to ensure each asset was reinstated safely and ready for recommissioning. Through careful planning, resource coordination, and efficient on-site execution, we delivered a seamless transition with minimal disruption to ongoing operations.